Structural Behavior of a Long-Span Partially Earth-Anchored Cable-Stayed Bridge during Installation of a Key Segment by Thermal Prestressing

Sang-Hyo Kim, Jeong-Hun Won

Applied Sciences· Volume 6· Issue 8

Abstract

This study investigated structural behavior of long-span partially earth-anchored cable-stayed bridges with a main span length of 810 m that use a new key segment closing method based on a thermal prestressing technique. A detailed construction sequence analysis matched with the free cantilever method (FCM) was performed using a three-dimensional finite element (FE) model of a partially earth-anchored cable-stayed bridge. The new method offers an effective way of connecting key segments by avoiding large movements resulting from the removal of the longitudinal restraint owing to the asymmetry of axial forces in the girders near the pylons. The new method develops new member forces through the process of heating the cantilever system before installing the key segment and cooling the system continuously after installing key segments. The resulting forces developed by the thermal process enhance the structural behavior of partially earth-anchored cable-stayed bridges owing to decreased axial forces in the girders.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Structural Engineering and Vibration Analysis · Concrete Corrosion and Durability · Railway Engineering and Dynamics

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

School of Civil and Environmental Engineering, Yonsei University, 50 Yonsei-ro Seodaemun-gu, Seoul 03722, Korea

Department of Safety Engineering, Chungbuk National University, Chungdae-ro 1, Seowon-Gu, Cheongju, Chungbuk 28644, Korea

References (20)

Show source-provided references
1. Gimsing, N.J. (1997). Cable Supported Bridges, Wiley. [2nd ed.].
2. Feasibility of a 1,400m span steel cable-stayed bridge10.1061/(ASCE)1084-0702(2004)9:5(444) ↗
3. Sun, B., Xiao, R.C., and Jia, L.J. Trial design of a proposed partially ground-anchored cable-stayed bridge with a main span 1 400 m. Available online: http://en.cnki.com.cn/Article_en/CJFDTOTAL-QLJS200903012.htm.
4. Jin, Z., Pei, S., Wei, X., Liu, H., and Qiang, S. (2016). partially earth-anchored cable bridge: Ultralong-span system suitable for carbon-fiber-reinforced plastic cables. J. Bridge Eng., 21.10.1061/(ASCE)BE.1943-5592.0000877 ↗
5. Gimsing, N.J. (2006). International Conference on Bridge Engineering: Challenges in the 21st Century: Kowloon Shangri-La Hotel, Hong Kong, 1-3 November 2006, The Hong Kong Institution of Engineers.
6. Innovative key-segment closing method using thermal prestressing technique for partially earth-anchored cable-stayed bridges10.1260/136943308786412041 ↗
7. An analytical investigation of thermal prestressing method for continuous composite girder bridges10.1680/macr.2007.59.3.165 ↗
8. An experimental investigation of thermal prestressing method for continuous composite steel girder bridges10.1680/macr.2007.59.3.179 ↗
9. Temperature variation in steel box girders of cable-stayed bridge during construction10.1016/j.jcsr.2015.04.016 ↗
10. Vibration based damage localization using MENS on a suspension bridge model10.12989/sss.2013.12.6.679 ↗
11. Domaneschi, M., and Martinelli, L. (2014). Extending the benchmark cable-stayed bridge for transverse response under seismic loading. J. Bridge Eng., 19.10.1061/(ASCE)BE.1943-5592.0000532 ↗
12. Refined optimal passive control of buffeting-induced wind loading of a suspension bridge10.12989/was.2014.18.1.001 ↗
13. Damage detection and localization on a benchmark cable-stayed bridge10.12989/eas.2015.8.5.1113 ↗
14. Some modeling aspects in the nonlinear finite element analysis of cable supported bridges10.1016/S0045-7949(98)00244-2 ↗
15. Analysis of cable-stayed bridges during construction by cantilever method10.1016/j.compstruc.2003.11.003 ↗
16. Pircher, H. (2004). User Guide for RM2004 and GP2004, TDV GmbH.
17. Optimization of cable tensioning in cable-stayed bridges10.1061/(ASCE)1084-0702(2003)8:3(131) ↗
18. Analysis of the construction process of cable-stayed bridges built on temporary supports10.1016/j.engstruct.2012.02.005 ↗
19. Forward algorithm for the construction control of cable-stayed bridges built on temporary supports10.1016/j.engstruct.2012.02.022 ↗
20. Direct simulation of the tensioning process of cable-stayed bridges10.1016/j.compstruc.2013.03.010 ↗