Abstract
In this paper, a flow shop scheduling problem with minimal and maximal machine idle time with the goal of minimizing makespan is considered. The mathematical model of the problem is presented. A generalization of the prefix sum, called the job shift scan, for computing required shifts for overlapping jobs is proposed. A work-efficient algorithm for computing the job shift scan in parallel for the PRAM model with n processors is proposed and its time complexity of O(logn) is proven. Then, an algorithm for computing the makespan in time O(mlogn) in parallel using the prefix sum and job shift scan is proposed. Computer experiments on GPU were conducted using the CUDA platform. The results indicate multi-thread GPU vs. single-thread GPU speedups of up to 350 and 1000 for job shift scan and makespan calculation algorithms, respectively. Multi-thread GPU vs. single-thread CPU speedups up to 4.5 and 14.7, respectively, were observed as well. The experiments on the Taillard-based problem instances using a simulated annealing solving method and employing the parallel makespan calculation show that the method is able to perform many more iterations in the given time limit and obtain better results than the non-parallel version.
Source: crossref · Quality: baseline
Research context
OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Optimization and Packing Problems
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
Affiliations
Department of Computer Engineering, Wrocław University of Science and Technology, 50-370 Wrocław, Poland
References (68)
Show source-provided references
1. Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: A case study at a manufacturing plant10.1016/j.cor.2020.105044 ↗
2. Dynamic Production Scheduling for Prefabricated Components Considering the Demand Fluctuation10.32604/iasc.2020.010105 ↗
3. The application of time coupling methods in the engineering of construction projects
4. A scheduling scheme in the cloud computing environment using deep Q-learning10.1016/j.ins.2019.10.035 ↗
5. QoS-Aware Energy-Efficient Task Scheduling on HPC Cloud Infrastructures Using Swarm-Intelligence Meta-Heuristics
6. Optimization of electric vehicle scheduling with multiple vehicle types in public transport10.1016/j.scs.2019.101862 ↗
7. Bassen, J., Balaji, B., Schaarschmidt, M., Thille, C., Painter, J., Zimmaro, D., Games, A., Fast, E., and Mitchell, J.C. Reinforcement Learning for the Adaptive Scheduling of Educational Activities. Proceedings of the 2020 CHI Conference on Human Factors in Computing Systems.10.1145/3313831.3376518 ↗
8. A Hybrid Genetic Algorithm for Nurse Scheduling Problem considering the Fatigue Factor10.1155/2021/5563651 ↗
9. CPU scheduling techniques: A review on novel approaches strategy and performance assessment10.38094/jastt1215 ↗
10. Service Scheduling Based on Edge Computing for Power Distribution IoT
11. Pipeline Scheduling Based on Constructive Interference in Strip Wireless Sensor Networks
12. A discrete differential evolution algorithm for flow shop group scheduling problem with sequence-dependent setup and transportation times10.1007/s10845-020-01580-3 ↗
13. An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives10.1016/j.ejor.2006.07.029 ↗
14. Workload Control order release in general and pure flow shops with limited buffer size induced blocking: An assessment by simulation10.1080/00207543.2020.1735667 ↗
15. Harbaoui, H., Khalfallah, S., and Bellenguez-Morineau, O. (2017, January 14–16). A case study of a hybrid flow shop with no-wait and limited idle time to minimize material waste. Proceedings of the 2017 IEEE 15th International Symposium on Intelligent Systems and Informatics (SISY), Subotica, Serbia.10.1109/SISY.2017.8080554 ↗
16. Ni, F., Hao, J., Lu, J., Tong, X., Yuan, M., Duan, J., Ma, Y., and He, K. A Multi-Graph Attributed Reinforcement Learning Based Optimization Algorithm for Large-Scale Hybrid Flow Shop Scheduling Problem. Proceedings of the 27th ACM SIGKDD Conference on Knowledge Discovery & Data Mining, KDD ’21.
17. A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems10.1007/s10489-019-01497-2 ↗
18. Virtual Machine Based on Genetic Algorithm Used in Time and Power Oriented Cloud Computing Task Scheduling10.31209/2019.100000115 ↗
19. Rudy, J., and Smutnicki, C. (2020). Online scheduling for a Testing-as-a-Service system. Bull. Pol. Acad. Sci. Tech. Sci., 68.10.24425/bpasts.2020.134187 ↗
20. Gmys, J. (2020). Solving large permutation flow-shop scheduling problems on GPU-accelerated supercomputers. arXiv.
21. Bozejko, W., and Wodecki, M. (2002, January 22–25). Solving the flow shop problem by parallel tabu search. Proceedings of the International Conference on Parallel Computing in Electrical Engineering, Warsaw, Poland.
22. Rutkowski, L., Korytkowski, M., Scherer, R., Tadeusiewicz, R., Zadeh, L.A., and Zurada, J.M. (2012). Fast Parallel Cost Function Calculation for the Flow Shop Scheduling Problem. Artificial Intelligence and Soft Computing, Springer.10.1007/978-3-642-29347-4 ↗
23. Idzikowski, R., Rudy, J., and Gnatowski, A. (2021). Solving Non-Permutation Flow Shop Scheduling Problem with Time Couplings. Appl. Sci., 11.10.3390/app11104425 ↗
24. Permutation Flow Shop Scheduling Problem with Makespan Criterion: Literature Review
25. Bocewicz, G., Pempera, J., and Toporkov, V. (2021). Parallel Computing for the Non-permutation Flow Shop Scheduling Problem with Time Couplings Using Floyd-Warshall Algorithm. Performance Evaluation Models for Distributed Service Networks, Springer.10.1007/978-3-030-67063-4 ↗
26. Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint10.1007/s10732-007-9061-z ↗
27. Optimal Scheduling Algorithms to Minimize Total Flowtime on a Two–Machine Permutation Flowshop with Limited Waiting Times and Ready Times of Jobs
28. An effective iterated greedy algorithm for scheduling unrelated parallel batch machines with non-identical capacities and unequal ready times10.1016/j.cie.2016.12.038 ↗
29. Real-time scheduling of parallel tasks with tight deadlines10.1016/j.sysarc.2020.101742 ↗
30. A memetic algorithm for joint production and distribution scheduling with due dates10.1016/j.cie.2020.106342 ↗
31. Kianpour, P., Gupta, D., Krishnan, K.K., and Gopalakrishnan, B. (2021). Automated job shop scheduling with dynamic processing times and due dates using project management and industry 4.0. J. Ind. Prod. Eng., 1–14.10.1080/21681015.2021.1937725 ↗
32. Solving no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines and rework time by the adjusted discrete Multi Objective Invasive Weed Optimization and fuzzy dominance approach
33. The no-wait flow shop with rejection10.1080/00207543.2020.1727042 ↗
34. A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems10.1016/j.asoc.2018.08.002 ↗
35. Energy-efficient no-wait permutation flow shop scheduling by adaptive multi-objective variable neighborhood search10.1016/j.omega.2019.102117 ↗
36. Discrete particle swarm optimization to solve multi-objective limited-wait hybrid flow shop scheduling problem10.1088/1757-899X/337/1/012006 ↗
37. Non-permutation flowshop scheduling problem with minimal and maximal time lags: Theoretical study and heuristic10.1007/s10479-018-2775-5 ↗
38. Permutation flowshop scheduling problems with maximal and minimal time lags10.1016/j.cor.2004.11.006 ↗
39. A co-evolutionary genetic algorithm for the two-machine flow shop group scheduling problem with job-related blocking and transportation times10.1016/j.eswa.2020.113360 ↗
40. An iterated greedy algorithm for the parallel blocking flow shop scheduling problem and sequence-dependent setup times10.1016/j.eswa.2021.115535 ↗
41. Tabu-search optimization approach for no-wait hybrid flow-shop scheduling with dedicated machines10.1016/j.procs.2020.09.043 ↗
42. A hybrid discrete water wave optimization algorithm for the no-idle flowshop scheduling problem with total tardiness criterion10.1016/j.eswa.2019.113166 ↗
43. Heuristics for the mixed no-idle flowshop with sequence-dependent setup times and total flowtime criterion10.1016/j.eswa.2019.01.057 ↗
44. Della Croce, F., Grosso, A., and Salassa, F. (2019). Minimizing total completion time in the two-machine no-idle no-wait flow shop problem. J. Heuristics, 1–15.10.1007/s10732-019-09430-z ↗
45. Tabu Search with two approaches to parallel flowshop evaluation on CUDA platform10.1016/j.jpdc.2011.02.006 ↗
46. Solving the flow shop problem by parallel programming10.1016/j.jpdc.2009.01.009 ↗
47. A new approach for multi-criteria scheduling10.1016/j.cie.2015.09.003 ↗
48. Parallel tabu search for the cyclic job shop scheduling problem10.1016/j.cie.2017.09.042 ↗
49. Rudy, J., Pempera, J., and Smutnicki, C. (2020). Improving the TSAB algorithm through parallel computing. Arch. Control. Sci., 411–435.
50. Rudy, J., and Żelazny, D. (2015). GACO: A parallel evolutionary approach to multi-objective scheduling. International Conference on Evolutionary Multi-Criterion Optimization, Springer.10.1007/978-3-319-15934-8_21 ↗
51. Filipič, B., Minisci, E., and Vasile, M. (2020). A Memetic Algorithm with Parallel Local Search for Flowshop Scheduling Problems. Bioinspired Optimization Methods and Their Applications, Springer International Publishing.10.1007/978-3-030-63710-1 ↗
52. Reconstructing permutation table to improve the Tabu Search for the PFSP on GPU10.1007/s11227-017-2041-7 ↗
53. Luo, J., Baz, D.E., and Hu, J. (2018, January 27–29). Acceleration of a CUDA-Based Hybrid Genetic Algorithm and its Application to a Flexible Flow Shop Scheduling Problem. Proceedings of the 2018 19th IEEE/ACIS International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing (SNPD), Busan, Korea.10.1109/SNPD.2018.8441112 ↗
54. GPU based parallel genetic algorithm for solving an energy efficient dynamic flexible flow shop scheduling problem10.1016/j.jpdc.2018.07.022 ↗
55. A dual heterogeneous island genetic algorithm for solving large size flexible flow shop scheduling problems on hybrid multicore CPU and GPU platforms10.1155/2019/1713636 ↗
56. Parallel Metaheuristics for Shop Scheduling: Enabling Industry 4.010.1016/j.procs.2021.01.328 ↗
57. Blelloch, G.E. (1990). Prefix Sums and Their Applications, Technical Report; Citeseer.
58. Parallel Dynamics Computation Using Prefix Sum Operations10.1109/LRA.2017.2666544 ↗
59. Nunes, L.S.N., Bordim, J.L., Ito, Y., and Nakano, K. (2018, January 27–30). A Prefix-Sum-Based Rabin-Karp Implementation for Multiple Pattern Matching on GPGPU. Proceedings of the 2018 Sixth International Symposium on Computing and Networking (CANDAR), Takayama, Japan.10.1109/CANDAR.2018.00026 ↗
60. K-Means for Parallel Architectures Using All-Prefix-Sum Sorting and Updating Steps10.1109/TPDS.2012.234 ↗
61. Data Parallel Algorithms10.1145/7902.7903 ↗
62. Job Shop Scheduling by Simulated Annealing10.1287/opre.40.1.113 ↗
63. Simulated annealing for permutation flow-shop scheduling10.1016/0305-0483(89)90059-5 ↗
64. Solving no-wait job-shop scheduling problems using a multi-start simulated annealing with bi-directional shift timetabling algorithm10.1016/j.cie.2020.106615 ↗
65. Wei, H., Li, S., Jiang, H., Hu, J., and Hu, J. (2018). Hybrid Genetic Simulated Annealing Algorithm for Improved Flow Shop Scheduling with Makespan Criterion. Appl. Sci., 8.10.3390/app8122621 ↗
66. Multi-temperature simulated annealing for optimizing mixed-blocking permutation flowshop scheduling problems10.1016/j.eswa.2020.113837 ↗
67. Parallel prefix sum (scan) with CUDA
68. Benchmarks for basic scheduling problems10.1016/0377-2217(93)90182-M ↗