journal article·2021-08-31Open access

A Parallel Algorithm for Scheduling a Two-Machine Robotic Cell in Bicycle Frame Welding Process

Andrzej Gnatowski, Teodor Niżyński

Applied Sciences· Volume 11· Issue 17

Abstract

Welding frames with differing geometries is one of the most crucial stages in the production of high-end bicycles. This paper proposes a parallel algorithm and a mixed integer linear programming formulation for scheduling a two-machine robotic welding station. The time complexity of the introduced parallel method is O(log2n) on an n3-processor Exclusive Read Exclusive Write Parallel Random-Access Machine (EREW PRAM), where n is the problem size. The algorithm is designed to take advantage of modern graphics cards to significantly accelerate the computations. To present the benefits of the parallelization, the algorithm is compared to the state of art sequential method and a solver-based approach. Experimental results show an impressive speedup for larger problem instances—up to 314 on a single Graphics Processing Unit (GPU), compared to a single-threaded CPU execution of the sequential algorithm.
Source: crossref · Quality: baseline

Research context

OpenAlex topics: Scheduling and Optimization Algorithms · Advanced Manufacturing and Logistics Optimization · Assembly Line Balancing Optimization

SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.

Affiliations

Department of Control Systems and Mechatronics, Wrocław University of Science and Technology, 50-370 Wrocław, Poland

Funding

National Science Centre of Poland

References (50)

Show source-provided references
1. The third comprehensive survey on scheduling problems with setup times/costs10.1016/j.ejor.2015.04.004 ↗
2. A survey of scheduling problems with no-wait in process10.1016/j.ejor.2016.05.036 ↗
3. A research survey: Review of flexible job shop scheduling techniques10.1111/itor.12199 ↗
4. Vlk, M., Novak, A., Hanzalek, Z., and Malapert, A. (2019). Non-overlapping Sequence-Dependent Setup Scheduling with Dedicated Tasks. International Conference on Operations Research and Enterprise Systems, Springer.10.1007/978-3-030-37584-3_2 ↗
5. Combinatorial optimization: Comparison of heuristic algorithms in travelling salesman problem10.1007/s11831-017-9247-y ↗
6. The multiobjective multidimensional knapsack problem: A survey and a new approach10.1111/j.1475-3995.2011.00840.x ↗
7. Collaborative vehicle routing: A survey10.1016/j.ejor.2017.10.023 ↗
8. A literature review on the vehicle routing problem with multiple depots10.1016/j.cie.2014.10.029 ↗
9. A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold10.1109/TCYB.2018.2796119 ↗
10. Zhang, F., Mei, Y., and Zhang, M. (2019, January 13–17). A Two-Stage Genetic Programming Hyper-Heuristic Approach with Feature Selection for Dynamic Flexible Job Shop Scheduling. Proceedings of the Genetic and Evolutionary Computation Conference, Prague, Czech Republic.10.1145/3321707.3321790 ↗
11. A two level metaheuristic for the operating room scheduling and assignment problem10.1016/j.cor.2014.08.014 ↗
12. Cyclic flow shop scheduling problem with two-machine cells10.1515/acsc-2017-0009 ↗
13. Maniezzo, V., Boschetti, M.A., and Stützle, T. (2021). Very Large-Scale Neighborhood Search. Matheuristics: Algorithms and Implementations, Springer International Publishing.10.1007/978-3-030-70277-9 ↗
14. A survey of very large-scale neighborhood search techniques10.1016/S0166-218X(01)00338-9 ↗
15. Cyclic scheduling of a 2-machine robotic cell with tooling constraints10.1016/j.ejor.2005.03.021 ↗
16. A new cuckoo search algorithm for 2-machine robotic cell scheduling problem with sequence-dependent setup times10.1016/j.swevo.2016.02.001 ↗
17. Scheduling in a three-machine robotic flexible manufacturing cell10.1016/j.cor.2005.09.015 ↗
18. Multi-Robot Assembly Strategies and Metrics10.1145/3150225 ↗
19. Towards optimal task positioning in multi-robot cells, using nested meta-heuristic swarm algorithms10.1016/j.rcim.2021.102131 ↗
20. Cyclic scheduling of parts and robot moves in m -machine robotic cells10.1016/j.cor.2017.09.018 ↗
21. Optimal robotic cell scheduling with controllers using mathematically based timed Petri nets10.1016/j.ins.2015.09.053 ↗
22. Simulation study on reward function of reinforcement learning in gantry work cell scheduling10.1016/j.jmsy.2018.11.005 ↗
23. A method integrating Q-Learning with approximate dynamic programming for gantry work cell scheduling10.1109/TASE.2020.2984739 ↗
24. Kampmeyer, T. (2006). Cyclic Scheduling Problems. [Ph.D. Thesis, University of Osnabruck].
25. Complexity of cyclic scheduling problems: A state-of-the-art survey10.1016/j.cie.2010.03.013 ↗
26. Modelling of flexible manufacturing system: A review10.1080/00207543.2017.1387302 ↗
27. A review of scheduling problem and resolution methods in flexible flow shop
28. Li, X., and Gao, L. (2020). Review for Flexible Job Shop Scheduling. Effective Methods for Integrated Process Planning and Scheduling, Springer.10.1007/978-3-662-55305-3 ↗
29. A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems10.1109/JAS.2019.1911540 ↗
30. An optimization model for cyclic scheduling problem in flexible robotic cells10.1007/s00170-017-1470-z ↗
31. Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: A case study at a manufacturing plant10.1016/j.cor.2020.105044 ↗
32. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem10.1016/0305-0483(83)90088-9 ↗
33. A worker constrained flexible job shop scheduling problem with sequence-dependent setup times10.1007/s00291-018-0537-z ↗
34. Simultaneous job scheduling and resource allocation on parallel machines10.1023/B:ANOR.0000030685.31167.11 ↗
35. A survey of scheduling with controllable processing times10.1016/j.dam.2007.02.003 ↗
36. Flow shop scheduling with resource flexibility10.1287/opre.42.3.504 ↗
37. Decision support for unrelated parallel machine scheduling with discrete controllable processing times10.1016/j.asoc.2015.01.028 ↗
38. Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times10.1007/s00170-011-3318-2 ↗
39. Project scheduling under partially renewable resources and resource consumption during setup operations10.1016/j.cie.2015.02.006 ↗
40. Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource10.1016/j.ijpe.2007.10.001 ↗
41. Gnatowski, A., Rudy, J., and Idzikowski, R. (2020, January 2–4). On two-machine Flow Shop Scheduling Problem with disjoint setups. Proceedings of the 2020 IEEE 15th International Conference of System of Systems Engineering (SoSE), Budapest, Hungary.10.1109/SoSE50414.2020.9130513 ↗
42. Programming parallel algorithms10.1145/227234.227246 ↗
43. Fortune, S., and Wyllie, J. (1978, January 1–3). Parallelism in random access machines. Proceedings of the Tenth annual ACM Symposium on Theory of Computing—STOC ’78, San Diego, CA, USA.10.1145/800133.804339 ↗
44. Goldschlager, L.M. (1978, January 1–3). A unified approach to models of synchronous parallel machines. Proceedings of the Tenth Annual ACM Symposium on Theory of Computing—STOC ’78, San Diego, CA, USA.10.1145/800133.804336 ↗
45. Skillicorn, D.B. (2005). Foundations of Parallel Programming, Cambridge University Press.
46. Grama, A., Gupta, A., Karypis, G., and Kumar, V. (2003). Introduction to Parallel Computing, Addison-Wesley. [2nd ed.].
47. Parallel Prefix Computation10.1145/322217.322232 ↗
48. Efficient Parallel Algorithms for Computing All Pair Shortest Paths in Directed Graphs10.1007/BF02523680 ↗
49. Δ-stepping: A parallelizable shortest path algorithm10.1016/S0196-6774(03)00076-2 ↗
50. Lund, B., and Smith, J.W. (2010). A Multi-Stage CUDA Kernel for Floyd-Warshall. arXiv.