Improvement of the PF ring vacuum system
Source abstract
Abstract
For an upgrade of the PF ring, about half of the vacuum ducts were replaced by newly made or improved ones, which were designed and manufactured to achieve the required beam lifetime. The concept of pumping was maintained. Every vacuum duct was pre-baked and installed with care so as not to introduce contamination caused by exposure to the atmosphere. The ring vacuum was successfully conditioned without an in situ bake-out. The operating pressure was speedily reduced by beam cleaning as the operation time increased. A low operating pressure and resulting long beam lifetime was achieved within a short operation period.
Source: openaire · Quality: candidate unverified · Source record ↗
Research context
OpenAlex topics: Particle accelerators and beam dynamics · Vacuum and Plasma Arcs · Particle Accelerators and Free-Electron Lasers
SciVX discovery tags are terminology-based. OpenAlex topics are source-provided classifications.
References (5)
Show source-provided references
1. M. Katoh, et al., J. Synchrotron Radiation 5 (1998) 366.10.1107/S0909049597014118 ↗
2. M. Katoh, et al., in: Proceedings of the 8th European Particle Accelerator Conference, Stockholm, Institute of Physics Publishing, 1998, p. 590.
3. K. Haga, T. Honda, T. Kasuga, T. Obina, M. Tadano, in: Proceedings of the 8th European Particle Accelerator Conference, Stockholm, Institute of Physics Publishing, 1998, p. 1517.
4. T. Honda, Y. Hori, M. Tadano, in: Proceedings of the 8th European Particle Accelerator Conference, Stockholm, Institute of Physics Publishing, 1998, p. 1526.
5. Hori · Vacuum · 1996 · 47 · 62110.1016/0042-207X(96)00033-4 ↗